Created jtemplate joomla templates

portugal-flag england-flag bw

  • Emission Monitoring
    Emission Monitoring

 

 

News

CJO

BHB CONCLUDES PROJECT FOR VOTORANTIM GROUP (TUNISIA)

BHB specialized operatives went to Tunisia in order to start-up the Cyclones Tower Gas Analysis System, as well as, train the local technical team of the Ciments de Jbel Oust Cement Plant.

 

BHB completed the modernization of the Cyclones Tower gas analysis system, a turn-key project, that included the installation of a new sampling and conditioning system, a new blowing system and the incorporation of an ABB Advance Optima URAS 26 analyzer, which allows the measurement of CO, NO and O2.

The commissioning, training of the local operators and start-up was a complete success with a great support from the local technical team.

  

Find out more about our services portfolio - by clicking here.